Grand Theater Qingdao


Architects: gmp architekten
Location: Qingdao, Shandong, China
Design Team: Meinhard von Gerkan, Stephan Schütz, Nicolas Pomränke
Project Year: 2010
Project Area: 60,000 sqm
Photographs: Christian GahlArchitects: gmp architekten
Location: Qingdao, Shandong, China
Design Team: Meinhard von Gerkan, Stephan Schütz, Nicolas Pomränke
Project Year: 2010
Project Area: 60,000 sqm
Photographs: Christian Gahl

The Grand Theater is situated on the eastern side of the city of Qingdao between a bay in the Yellow Sea and Mount Laoshan (1,130m above sea level). Because of the unique situation of the massif directly by the sea, the Laoshan ridge is often wreathed in clouds, which gives the landscape a unique, often mystical, setting.

The style of the building relates to the mentioned natural spectacle, with the massif and the lightness of the clouds reflected in the appearance of the Grand Theater. It rises from the landscape like a mountain — a cloud-like roof seems to wreathe the four buildings. The raised terraces in the surrounding park are reminiscent of a mountain plateau, and take their bearings both from the sea and the mountains.

In addition to the opera house a concert and a multifunction hall as well as a media center and a hotel are integrated into the complex.


The foyer of the opera house offers direct views of the sea. Audiences can enter the auditorium on two levels, either via the lower level, giving access to the large cloakrooms and the lower circle, or via the main foyer.





Warsaw’s National Stadium wins World Stadium Award 2012


Designed by gmp Architekten, Warsaw’s National Stadium prevailed against international competition and won the World Stadium Award in the best multi-functional stadium design and most innovative use of technology categories in stadium design. On the occasion of the 2012 UEFA European Football Championship, the stadium was reconstructed on top of the existing – but since 1988 no longer used and dilapidated – earth wall stadium (Stadion Dziesieciolecia), and re-opened in January of this year.

The stadium’s construction consists of two succinct parts – the grandstand built of pre-fabricated concrete components and the steel wire net roof with a textile membrane suspended from freestanding steel supports with inclined tie rods above this. The interior roof consists of a retractable membrane sail which folds together above the center of the pitch. This is also where the four-screen “video cube” is installed so as to provide an optimum view from all seats. The top tier is accessed via 12 arch-shaped, single-flight staircases.


The exterior façade consists of anodized expanded metal that provides another envelope for the actual thermal shell of the interior areas and access steps. The panels with their red and bright silver color scheme appear either closed or transparent, depending on the light angle, and from a distance evoke the image of an artistic composition in white and red, the country’s national colors.



The stadium has been designed as a multifunctional events center and, with its approx. 20,000 sqm of office and conference facilities, comprises a comparatively high proportion of floor space which can be used independently of the stadium operation. These spaces are available for all types of events and include the necessary support facilities.


Architects: gmp Architekten
Location: Doha, Quatar
Design: Volkwin Marg and Hubert Nienhoff with Markus Pfisterer
Project Management: Markus Pfisterer, Martin Hakiel
Project Management (roof): Martin Glass
In cooperation With: J.S.K. Architekci Sp. z o.o. and schlaich bergermann und partner
Structural Design of Roof: schlaich bergermann and partners, Knut Göppert with Knut Stockhusen and Lorenz Haspel, M&E Engineering HTW, Hetzel, Tor-Westen + Partner, Biuro Projektów “DOMAR”
Landscape Design: RAK, Architectura Krajobrazu, Warsaw

General Contractor: Konsorcjum ALPINE BAU DEUTSCHLAND AG, ALPINE BAU GmbH, ALPINE Construction Polska Sp. z o.o., HYDROBUDOWA POLSKA S.A. i PBG S.A.

Client: Narodowe Centrum Sportu Sp. z o.o.
Seats: 55,000

Competition: 2007 – 1st prize
Construction Period: 2008-2011